FOREST-3 (62634)

COSPAR: 2025-009AB | Alt Name: FOREST-3

Image
FOREST-3 Satellite Image
Additional Sources
Launch Details

Launch Date

January 14, 2025

Launch Site

AFWTR

Launch Pad

SLC4E

Launch Vehicle

Falcon 9

Orbital Elements

NORAD ID

62634

International Designator

2025-009AB

Epoch

Sun, 19 Jul 2026 18:41:28 GMT

Apogee

Calculating...

Perigee

Calculating...

Inclination

97.40°

Right Ascension

285.46°

Eccentricity

Calculating...

Argument of Perigee

152.11°

Period

93.79 min

Mean Motion

15.35 rev/day

Latitude

Calculating...

Longitude

Calculating...

Altitude

Calculating...

Velocity

Calculating...

Polar Plot
3D Visualization
Basic Satellite Info

Name

FOREST-3

Alternative Name

FOREST-3

Type

Payload

Status

Partially operational

Owner

ORORA

Country

Germany

Constellation

N/A

Related Satellites

Major Events

N/A

Latest TLEs
1 62634U 25009AB  26200.77880590  .00004577  00000+0  13580-3 0  9993
2 62634  97.4018 285.4611 0002526 152.1137 208.0242 15.35325452 84087

Source: Celestrak

Summary
FOREST-3 is a Cubesat 8U satellite manufactured by ORORA and owned by the same entity. Launched on January 14, 2025, from SLC4E using a Falcon 9 launch vehicle, FOREST-3 has dimensions of 0.4 meters in length and span, with a diameter of 0.2 meters. The satellite weighs 15 kilograms both at launch and dry mass. Its shape is described as a box, though additional details about its purpose, power source, or equipment are not provided.
Physical Characteristics

Length

0.4

Diameter

0.2

Span

0.4

Dry Mass

15

Launch Mass

15

Shape

Box

Radar Cross Section

Unknown

Visual Magnitude

Unknown

Color

Unknown

Material Composition

Unknown

Technical Details

Payload

FOREST-3

Purpose

Unknown

Mission

Unknown

Manufacturer

ORORA

Life Expectancy

Unknown

Bus

Cubesat 8U

Configuration

Unknown

Motor

Unknown

Equipment

Unknown

Power System

Unknown

ADCS

Unknown

Transmitter Frequency

Unknown

Map
This tool will help you track the satellite's position and predict its upcoming passes over your location. Simply input the coordinates or click the geolocation button to get started.
Next Pass
Azimuth Elevation Time (Local)
Start Azimuth
Max Elevation
Stop Azimuth
Time Until
Pass Duration

Satellite Articles

View All Posts »

Learn more about satellites and other related topics.

X Report 3 May 2025

X Report 3 May 2025

Key updates include a successful Falcon 9 launch of 28 Starlink satellites and a static fire test of the Starship spacecraft, while T-Mobile's Starlink service aims to attract new customers.

X Report 20 Sep 2025

X Report 20 Sep 2025

SpaceX successfully launched 24 Starlink satellites from California, enhancing its global internet coverage as the company continues to dominate the satellite communications market.

X Report 20 Jun 2025

X Report 20 Jun 2025

SpaceX experiences significant setbacks with Starship after Ship 36 explodes during static fire preparations, while Eutelsat secures funding to bolster competition against Starlink.

Golden Dome Missile Shield Costs Up to $1.2T Over 20 Years | KeepTrack Space Brief

Golden Dome Missile Shield Costs Up to $1.2T Over 20 Years | KeepTrack Space Brief

CBO estimates Golden Dome national missile shield at $1.2 trillion over 20 years. Space-based intercept layer could add thousands of satellites to tracked orbital regimes.

Space Force Modernizes Networks Across 14 Bases, SDA Expands $3.5B Satellite Program | KeepTrack Space Brief

Space Force Modernizes Networks Across 14 Bases, SDA Expands $3.5B Satellite Program | KeepTrack Space Brief

Space Force initiates cybersecurity network upgrades across 14 bases. SDA expands $3.5B Tracking Layer with 72 new satellites. SpaceX and China drive record orbital launches in 2025.

X Report 12 May 2025

X Report 12 May 2025

SpaceX prepares for its 100th Falcon 9 launch from Kennedy Space Center while facing a scrubbed attempt of the latest Starlink deployment.

Space Force Forecasts 25 Extra Heavy-Lift Missions Through 2029 | KeepTrack Space Brief

Space Force Forecasts 25 Extra Heavy-Lift Missions Through 2029 | KeepTrack Space Brief

Space Force projects 25 additional high-energy missions in 2027–2029 window, straining capacity at Vulcan and Falcon Heavy. Capacity constraints will drive military-NASA prioritization debates.

€140M ESA Launcher Funding at Risk of Lapse | KeepTrack Space Brief

€140M ESA Launcher Funding at Risk of Lapse | KeepTrack Space Brief

Nearly €140 million in ESA launcher development funds faces forfeiture with no replacement mechanism. Europe's independent launch capacity under pressure as Arianespace struggles.