Etlaq Spaceport
The Middle East's first commercial spaceport is building launch heritage one rocket at a time. How Oman is positioning Duqm as a global launch hub - and what the 2025 delays tell us about the real pace of spaceport development.
Launch Date
September 30, 1969
Launch Site
AFWTR
Launch Pad
SLC1W
Launch Vehicle
Thorad SLV-2G Agena D
NORAD ID
04237
International Designator
1969-082E
Epoch
Sun, 19 Jul 2026 20:20:36 GMT
Apogee
Calculating...
Perigee
Calculating...
Inclination
70.01°
Right Ascension
34.12°
Eccentricity
Calculating...
Argument of Perigee
87.15°
Period
103.15 min
Mean Motion
13.96 rev/day
Latitude
Calculating...
Longitude
Calculating...
Altitude
Calculating...
Velocity
Calculating...
Name
OPS 7613 (P/L 4)
Alternative Name
OPS 7613 P/L 4
Type
Status
Owner
NRO/NRL
Country
United States
Constellation
N/A
Related Satellites
Major Events
N/A
1 04237U 69082E 26200.84764389 -.00000012 00000+0 29372-4 0 9990
2 04237 70.0148 34.1186 0017957 87.1455 7.2357 13.96000804890866
Source: Celestrak
Apologies, there is no summary for this satellite yet. I am working to generate these for every object in the catalog, but it is going to take time.
Length
0.8
Diameter
0.6
Span
1.5
Dry Mass
101
Launch Mass
101
Shape
Ell + 2 Ant
Radar Cross Section
0.9461
Visual Magnitude
Unknown
Color
Unknown
Material Composition
Unknown
Payload
POPPY 6 Bravo
Purpose
ELINT, ocean surveillance
Mission
ELINT, ocean surveillance
Manufacturer
Naval Research Laboratory
Life Expectancy
ca. 34 month (average)
Bus
NRL MULTI
Configuration
Unknown
Motor
Ammonia cold gas microthrusters
Equipment
Unknown
Power System
Solar cells, batteries
ADCS
Unknown
Transmitter Frequency
Unknown
Learn more about satellites and other related topics.
The Middle East's first commercial spaceport is building launch heritage one rocket at a time. How Oman is positioning Duqm as a global launch hub - and what the 2025 delays tell us about the real pace of spaceport development.
On April 25, 1990, the Space Shuttle Discovery's robotic arm lifted a 11,110-kilogram barrel of mirrors and instruments out of the payload bay and released it into orbit. Six weeks later, the first images came back badly out of focus. The Hubble Space Telescope had been ground to the wrong prescription, and America had just spent $2.5 billion on what the press was calling a 'technoturkey.'
Today's Space Brief covers major developments in Pentagon procurement methods, strategic satellite intelligence advancements, and increasing interest in drone technology within the defense sector.
Current number of Starlink satellites in orbit April 2026: 10,168 working of 10,177 tracked, 11,724 launched. Fleet health tops 99.9%.
Shenzhou-23 docked with Tiangong May 24 with 3 astronauts, including Hong Kong's first crew member. One will stay ~1 year in orbit.
SpaceX secured a $178.5M Space Force contract to launch missile-tracking satellites from 2027, backing the Missile Track Custody threat-tracking layer.
Falcon Heavy completed its 12th flight ever on April 29, ending an 18-month stand-down by lofting the 6-ton ViaSat-3 F3 comsat to GTO.
ULA's Vulcan Centaur faces potential months-long stand-down. Space Force actively exploring payload reassignment and satellite operational life extensions to cover critical national security missions.