JIELONG 3 R/B (65562)

COSPAR: 2025-201N | Alt Name: N/A
DECAYED

Image
JIELONG 3 R/B Satellite Image
Additional Sources
Launch Details

Launch Date

September 8, 2025

Launch Site

YSLA

Launch Pad

LP6

Launch Vehicle

Jielong-3

Orbital Elements

NORAD ID

65562

International Designator

2025-201N

Decay Date

9/24/2025

Explore in the Catalog
Basic Satellite Info

Name

JIELONG 3 R/B

Alternative Name

N/A

Type

Rocket Body

Status

Space Junk

Owner

CZHJ

Country

China

Constellation

N/A

Related Satellites

Major Events

N/A

Summary
A rocket body, also commonly referred to as an upper stage or spent rocket stage, is the structural shell left behind after a rocket has delivered its payload to orbit. These large and often heavy pieces of space hardware can remain in orbit for years, posing significant collision hazards as part of the growing space debris problem. If left uncontrolled, rocket bodies have the potential to reenter Earth's atmosphere unpredictably, which can lead to falling debris in populated areas. Additionally, they risk colliding with operational satellites or the International Space Station, creating more debris and putting human life at risk.
Physical Characteristics

Length

1.5

Diameter

1.5

Span

1.5

Dry Mass

500

Launch Mass

500

Shape

Cyl

Radar Cross Section

Unknown

Visual Magnitude

Unknown

Color

Unknown

Material Composition

Unknown

Technical Details

Payload

JL-3 Stage 4

Purpose

Unknown

Mission

Unknown

Manufacturer

CZHJ

Life Expectancy

Unknown

Bus

Unknown

Configuration

Unknown

Motor

Unknown

Equipment

Unknown

Power System

Unknown

ADCS

Unknown

Transmitter Frequency

Unknown

Satellite Articles

View All Posts »

Learn more about satellites and other related topics.

X Report 9 Feb 2025

X Report 9 Feb 2025

SpaceX prepares for another Starlink launch while facing potential C-band spectrum challenges.

€140M ESA Launcher Funding at Risk of Lapse | KeepTrack Space Brief

€140M ESA Launcher Funding at Risk of Lapse | KeepTrack Space Brief

Nearly €140 million in ESA launcher development funds faces forfeiture with no replacement mechanism. Europe's independent launch capacity under pressure as Arianespace struggles.

House Backs $55.5B Space Force Budget, Excludes $350B Reconciliation | KeepTrack Space Brief

House Backs $55.5B Space Force Budget, Excludes $350B Reconciliation | KeepTrack Space Brief

House appropriators approved $55.5 billion for Space Force but omitted $350 billion reconciliation funds, threatening Golden Dome and large-scale space programs' acquisition timelines.

Space Brief 7 Feb 2025

Space Brief 7 Feb 2025

Today's highlights include significant legal disputes in military satellite contracts, strategic investments in the defense space sector, and updates on major military budget developments impacting space capabilities.

Space Brief 6 Mar 2025

Space Brief 6 Mar 2025

Today's brief covers secret Space Force payloads monitoring China's satellites, collaborations reducing satellite tracking delays, and new AI projects for military operations.

Starlink Installed on Presidential Air Force One | KeepTrack X Report

Starlink Installed on Presidential Air Force One | KeepTrack X Report

SpaceX Starlink connectivity equips Trump's $400M interim Air Force One as Falcon 9 prepares to orbit 24 more satellites on mission 17-28.

Space Force Awards $1.8B Andromeda Program to 14 Firms | KeepTrack Space Brief

Space Force Awards $1.8B Andromeda Program to 14 Firms | KeepTrack Space Brief

Space Force selects 14 companies for $1.8 billion Andromeda program to replace GSSAP geosynchronous surveillance satellites with commercial alternatives through 2036.

Space Brief 29 Jun 2025

Space Brief 29 Jun 2025

Today's space brief covers SpaceX's new contract with the U.S. Space Force, multiple Starlink launches, Rocket Lab's rapid launch success, and the final mission of Japan's H-IIA rocket.