X Report 30 Jun 2025
SpaceX is exploring alternative options for static fire tests amid infrastructure setbacks, emphasizing their adaptability in operations.
NORAD ID
62696
International Designator
2025-009CR
Epoch
Sun, 19 Jul 2026 17:18:12 GMT
Apogee
Calculating...
Perigee
Calculating...
Inclination
97.69°
Right Ascension
282.10°
Eccentricity
Calculating...
Argument of Perigee
24.44°
Period
95.82 min
Mean Motion
15.03 rev/day
Latitude
Calculating...
Longitude
Calculating...
Altitude
Calculating...
Velocity
Calculating...
Name
SatGus
Alternative Name
SatGus
Type
Status
Owner
CRUNCH
Country
United States
Constellation
N/A
Related Satellites
Major Events
N/A
1 62696U 25009CR 26200.72098013 .00003793 00000+0 28736-3 0 9995
2 62696 97.6897 282.0957 0001696 24.4402 335.6903 15.02874020 82444
Source: Celestrak
Length
0.4
Diameter
0.2
Span
0.4
Dry Mass
0.2
Launch Mass
0.4
Shape
Box
Radar Cross Section
Unknown
Visual Magnitude
Unknown
Color
Unknown
Material Composition
Unknown
Payload
Tyvak-xxxx
Purpose
Unknown
Mission
Unknown
Manufacturer
TERRAN
Life Expectancy
Unknown
Bus
Cubesat 16U
Configuration
Unknown
Motor
Unknown
Equipment
Unknown
Power System
Unknown
ADCS
Unknown
Transmitter Frequency
Unknown
Learn more about satellites and other related topics.
SpaceX is exploring alternative options for static fire tests amid infrastructure setbacks, emphasizing their adaptability in operations.
Discover the latest in space news with the ULA's recent launch for the US Space Force, significant developments in radar tracking at high altitudes, and impactful policy changes involving military space missions.
Forty years ago today, Challenger lifted off LC-39A on a science mission that nobody outside Morton-Thiokol would call dangerous. Years later, after the orbiter and seven other astronauts were gone, investigators looked at the recovered boosters from STS-51B and realized the crew had come within a fraction of a second of dying first. This is the story of the launch that should have been a warning.
SpaceX has adapted Pad 1 for Ship Static Fire tests while addressing the recent downtime at Massey’s, showcasing its commitment to maintaining launch schedules despite setbacks.
SpaceX engineers are overhauling Starbase launch infrastructure for Block 3 Starships as Falcon 9 prepares another Starlink batch run.
Key updates include the impending Falcon 9 launch for Transporter-14, insights on Starship's explosion, and a last-minute abort of the Starlink 10-23 mission.
Sixty years of space toilet engineering, a decade of development, and a $30 million contract - and the Artemis II crew still had to pee in bags on Day 1.
NASA is adding 6 post-certification crew missions to SpaceX's contract as Boeing remains unable to certify Starliner for operational flights.