GONETS-M 10 (40063)

COSPAR: 2014-036C | Alt Name: Gonets-M No. 20L

Image
GONETS-M 10 Satellite Image
Additional Sources
Launch Details

Launch Date

July 3, 2014

Launch Site

PLMSC

Launch Pad

LC133/3

Launch Vehicle

Rokot

Orbital Elements

NORAD ID

40063

International Designator

2014-036C

Epoch

Sat, 04 Jul 2026 07:06:17 GMT

Apogee

Calculating...

Perigee

Calculating...

Inclination

82.51°

Right Ascension

297.05°

Eccentricity

Calculating...

Argument of Perigee

105.00°

Period

115.85 min

Mean Motion

12.43 rev/day

Latitude

Calculating...

Longitude

Calculating...

Altitude

Calculating...

Velocity

Calculating...

Polar Plot
3D Visualization
Basic Satellite Info

Name

GONETS-M 10

Alternative Name

Gonets-M No. 20L

Type

Payload

Status

Operational

Owner

GONETS

Country

Russia

Constellation

N/A

Related Satellites

Major Events

N/A

Latest TLEs
1 40063U 14036C   26185.29603044  .00000142  00000-0  94990-3 0  9998
2 40063  82.5130 297.0478 0023002 104.9980 255.3647 12.42946418544375

Source: Celestrak

Summary
GONETS-M 10, also known as Gonets-M No. 20L, is a communication and store-dump satellite launched on July 3, 2014, from Plesetsk Cosmodrome Launch Pad LC133/3 using the Rokot launch vehicle. It was manufactured by RESH for GONETS and has dimensions of 1.6 meters in length, 0.8 meters in diameter, and a span of 7 meters when its solar arrays are deployed. The satellite's dry mass is 280 kilograms, which is also its launch mass. It features two deployable fixed solar arrays and batteries for power supply and has an expected operational lifetime of 5-7 years. Its shape consists of a cylinder with antennas, and it operates in space to support communication missions.
Physical Characteristics

Length

1.6

Diameter

0.8

Span

7

Dry Mass

280

Launch Mass

280

Shape

Cyl + Ant

Radar Cross Section

1.7151

Visual Magnitude

Unknown

Color

Unknown

Material Composition

Unknown

Technical Details

Payload

Gonets-M No. 20L (G002)

Purpose

Communication, Store-Dump

Mission

Communication, Store-Dump

Manufacturer

RESH

Life Expectancy

5-7 years

Bus

Strela-3M

Configuration

Unknown

Motor

Unknown

Equipment

Unknown

Power System

2 deployable fixed solar arrays, solar cells, batteries

ADCS

Unknown

Transmitter Frequency

Unknown

Map
This tool will help you track the satellite's position and predict its upcoming passes over your location. Simply input the coordinates or click the geolocation button to get started.
Next Pass
Azimuth Elevation Time (Local)
Start Azimuth
Max Elevation
Stop Azimuth
Time Until
Pass Duration

Satellite Articles

View All Posts »

Learn more about satellites and other related topics.

X Report 4 Mar 2025

X Report 4 Mar 2025

SpaceX faces a series of challenges with scrubbing the Starship Flight 8 launch and losing a Falcon 9 booster post-landing, while successfully deploying new Starlink satellites.

$4.16B Golden Dome Contract Awarded to SpaceX | KeepTrack X Report

$4.16B Golden Dome Contract Awarded to SpaceX | KeepTrack X Report

SpaceX wins a $4.16B Pentagon contract for missile-tracking satellites, while hitting its 50th Starlink launch of 2026 in a landmark May.

Space Brief 18 Jan 2025

Space Brief 18 Jan 2025

In today's brief: high-profile personnel changes in the Space Force, the inclusion of Space Force in historical political events, and strategic shifts in defense highlighted with a focus on satellite applications.

STS-51B | Three-Tenths of a Second from Disaster

STS-51B | Three-Tenths of a Second from Disaster

Forty years ago today, Challenger lifted off LC-39A on a science mission that nobody outside Morton-Thiokol would call dangerous. Years later, after the orbiter and seven other astronauts were gone, investigators looked at the recovered boosters from STS-51B and realized the crew had come within a fraction of a second of dying first. This is the story of the launch that should have been a warning.

NASA Awards SpaceX 6 More Crew Missions as Boeing Stalls | KeepTrack X Report

NASA Awards SpaceX 6 More Crew Missions as Boeing Stalls | KeepTrack X Report

NASA is adding 6 post-certification crew missions to SpaceX's contract as Boeing remains unable to certify Starliner for operational flights.

Artemis 2 Crew Reaches Moon, NASA Cuts Budget 25% | KeepTrack Space Brief

Artemis 2 Crew Reaches Moon, NASA Cuts Budget 25% | KeepTrack Space Brief

Artemis 2's four astronauts entered lunar sphere of influence April 6, first crewed arrival since Apollo 17. NASA simultaneously proposed 25% budget cut for FY2027.

X Report 29 Dec 2024

X Report 29 Dec 2024

SpaceX wraps up 2024 with successful Starlink and Astranis launches, while reflecting on a monumental year for the Starship program.

The Day Humanity Got Its First Close-up of the Future Apollo Landing Site

The Day Humanity Got Its First Close-up of the Future Apollo Landing Site

Sixty years ago, a pioneering spacecraft called Ranger 8 captured thousands of detailed photographs of the lunar surface before intentionally crashing into the Moon, helping pave the way for humanity's first steps on another world