PROMETHEUS 1-7 (39399)

COSPAR: 2013-064V | Alt Name: Prometheus 1-7
DECAYED

Image
PROMETHEUS 1-7 Satellite Image
Additional Sources
Launch Details

Launch Date

November 20, 2013

Launch Site

WLPIS

Launch Pad

Pad 0B

Launch Vehicle

Minotaur I

Orbital Elements

NORAD ID

39399

International Designator

2013-064V

Decay Date

12/5/2015

Basic Satellite Info

Name

PROMETHEUS 1-7

Alternative Name

Prometheus 1-7

Type

Payload

Status

Decayed

Owner

SOCOM/LANL

Country

United States

Constellation

N/A

Related Satellites

Major Events

N/A

Summary
PROMETHEUS 1-7 is a CubeSat (1.5U) technology satellite launched on November 20, 2013, from Wallops Flight Facility Pad 0B using a Minotaur I launch vehicle. Manufactured by LANL and owned by SOCOM/LANL, it has dimensions of 0.1 meters in length, diameter, and span with a dry mass of 1 kilogram. The satellite is powered by four deployable fixed solar arrays and batteries. It was designed for a lifetime of 3-5 years and has a box shape with a reflectivity coefficient (RCS) of 0.172. Its primary purpose is technology demonstration, carrying the Prometheus 7 payload.
Physical Characteristics

Length

0.1

Diameter

0.1

Span

0.1

Dry Mass

1

Launch Mass

1

Shape

Box

Radar Cross Section

0.172

Visual Magnitude

Unknown

Color

Unknown

Material Composition

Unknown

Technical Details

Payload

Prometheus 7

Purpose

Technology

Mission

Technology

Manufacturer

LANL

Life Expectancy

3-5 years

Bus

Cubesat 1.5U

Configuration

CubeSat (1.5U)

Motor

None

Equipment

Unknown

Power System

4 deployable fixed solar arrays, batteries

ADCS

Unknown

Transmitter Frequency

Unknown

Satellite Articles

View All Posts »

Learn more about satellites and other related topics.

Space Brief 3 Mar 2025

Space Brief 3 Mar 2025

Historic moon landing by Firefly Aerospace, Spanish Air and Space Force advances with new simulator, and spotlight on OneWeb's communication satellite.

Starship V3 Targets May 19 Debut; FCC OKs $2.4B Spectrum Deal | KeepTrack X Report

Starship V3 Targets May 19 Debut; FCC OKs $2.4B Spectrum Deal | KeepTrack X Report

SpaceX targets May 19 for Starship V3's first flight from Pad 2 as the FCC approves a $2.4B EchoStar spectrum deal for Starlink D2D.

Space Brief 26 Oct 2024

Space Brief 26 Oct 2024

Explore the recent signing of the Artemis Accords by Chile, Boeing's strategic considerations, and captivating space missions including China's satellite endeavors and the James Webb Space Telescope's latest discovery.

Space Brief 12 Jul 2025

Space Brief 12 Jul 2025

Today's focus spans from major military training initiatives in orbit to key updates on drone policies and crucial satellite launches.

Space Brief 13 Dec 2024

Space Brief 13 Dec 2024

Today's brief highlights the U.S. Space Force's upcoming modular satellite mission, increased military reliance on commercial space intelligence, and the demand for expanded commercial reserve support. Learn more about these advancements alongside our Satellite Spotlight on Yaogan-30 B.

Space Brief 16 Sep 2024

Space Brief 16 Sep 2024

Highlights of the day include the Polaris Dawn mission's splashdown, advances in space traffic management, and intriguing astronomy insights from the cloud's edge.

Space Brief 21 Oct 2024

Space Brief 21 Oct 2024

Today's Space Brief covers SpaceX's recent launch for OneWeb, advances in remote-control robots for lunar missions, the power loss of Intelsat 33e, and developments in inflatable space habitats.

Shotwell Details xAI Power Pledge at White House | KeepTrack X Report

Shotwell Details xAI Power Pledge at White House | KeepTrack X Report

SpaceX President Gwynne Shotwell joined Trump at the White House to outline xAI's energy commitment, while Transporter-18 targets October 2026 launch.