IUS R/B(1) (23614)

COSPAR: 1995-035C | Alt Name: IUS-26 SRM-1

Image
IUS R/B(1) Satellite Image
Additional Sources
Launch Details

Launch Date

July 13, 1995

Launch Pad

LC39B

Launch Vehicle

Space Shuttle

Orbital Elements

NORAD ID

23614

International Designator

1995-035C

Epoch

Sat, 04 Jul 2026 00:41:51 GMT

Apogee

Calculating...

Perigee

Calculating...

Inclination

26.13°

Right Ascension

52.51°

Eccentricity

Calculating...

Argument of Perigee

171.14°

Period

546.72 min

Mean Motion

2.63 rev/day

Latitude

Calculating...

Longitude

Calculating...

Altitude

Calculating...

Velocity

Calculating...

Polar Plot
3D Visualization
Basic Satellite Info

Name

IUS R/B(1)

Alternative Name

IUS-26 SRM-1

Type

Rocket Body

Status

Space Junk

Owner

GSFC

Country

United States

Constellation

N/A

Related Satellites

Major Events

N/A

Latest TLEs
1 23614U 95035C   26185.02906720  .00001288  00000-0  85492-3 0  9996
2 23614  26.1326  52.5069 6981435 171.1358 215.0276  2.63389736278172

Source: Celestrak

Summary
A rocket body, also commonly referred to as an upper stage or spent rocket stage, is the structural shell left behind after a rocket has delivered its payload to orbit. These large and often heavy pieces of space hardware can remain in orbit for years, posing significant collision hazards as part of the growing space debris problem. If left uncontrolled, rocket bodies have the potential to reenter Earth's atmosphere unpredictably, which can lead to falling debris in populated areas. Additionally, they risk colliding with operational satellites or the International Space Station, creating more debris and putting human life at risk.
Physical Characteristics

Length

3.5

Diameter

2.3

Span

3.5

Dry Mass

1164

Launch Mass

11109

Shape

Cyl

Radar Cross Section

10.5586

Visual Magnitude

Unknown

Color

Unknown

Material Composition

Unknown

Technical Details

Payload

Orbus 21

Purpose

Unknown

Mission

Unknown

Manufacturer

CSD

Life Expectancy

Unknown

Bus

Orbus 21

Configuration

Unknown

Motor

Unknown

Equipment

Unknown

Power System

Unknown

ADCS

Unknown

Transmitter Frequency

Unknown

Map
This tool will help you track the satellite's position and predict its upcoming passes over your location. Simply input the coordinates or click the geolocation button to get started.
Next Pass
Azimuth Elevation Time (Local)
Start Azimuth
Max Elevation
Stop Azimuth
Time Until
Pass Duration

Satellite Articles

View All Posts »

Learn more about satellites and other related topics.

Ku-Band

Ku-Band

The frequency band that brought satellite TV to small dishes on rooftops and revolutionized direct-to-home broadcasting

Space Brief 16 Sep 2025

Space Brief 16 Sep 2025

Today's brief highlights the impact of military spending and technology competition on the space economy, new satellite connectivity partnerships, and defense spending pledges in Europe.

Pentagon Allocates $8B for Space-Based Moving Target Tracking | KeepTrack Space Brief

Pentagon Allocates $8B for Space-Based Moving Target Tracking | KeepTrack Space Brief

Pentagon requests $8 billion for space-based moving target tracking constellation in FY2027 budget. New NORAD IDs expected as Space Force expands orbital ISR capabilities.

X Report 4 Oct 2025

X Report 4 Oct 2025

SpaceX continues to push forward with significant milestones, including the launch of additional Starlink satellites and progress on spectrum acquisitions.

Space Brief 18 Nov 2024

Space Brief 18 Nov 2024

Today's brief highlights a Starlink satellite launch, an OpTech optical sensor contract for the Space Force, and a unique STEM experiment involving space-flown seeds.

Space Brief 18 Dec 2025

Space Brief 18 Dec 2025

Today's updates cover Rocket Lab's launch for the U.S. Space Force, Digantara's major funding round, and discussions on national security in space.

X Report 22 Dec 2025

X Report 22 Dec 2025

SpaceX celebrates a year of industry milestones, including the successful deployment of Starlink satellites and innovative advancements in rocket technology.

Starship V3 Targets May 19 Debut; FCC OKs $2.4B Spectrum Deal | KeepTrack X Report

Starship V3 Targets May 19 Debut; FCC OKs $2.4B Spectrum Deal | KeepTrack X Report

SpaceX targets May 19 for Starship V3's first flight from Pad 2 as the FCC approves a $2.4B EchoStar spectrum deal for Starlink D2D.