SL-12 R/B(AUX MOTOR) (20698)

COSPAR: 1990-061F | Alt Name: DM2-24L SOZ-2
DECAYED

Image
SL-12 R/B(AUX MOTOR) Satellite Image
Additional Sources
Launch Details

Launch Date

July 18, 1990

Launch Pad

LC200/39

Launch Vehicle

Proton-K/DM-2

Orbital Elements

NORAD ID

20698

International Designator

1990-061F

Decay Date

7/16/2000

Basic Satellite Info

Name

SL-12 R/B(AUX MOTOR)

Alternative Name

DM2-24L SOZ-2

Type

Rocket Body

Status

Space Junk

Owner

RVSN

Country

USSR

Constellation

N/A

Related Satellites

Major Events

N/A

Summary
A rocket body, also commonly referred to as an upper stage or spent rocket stage, is the structural shell left behind after a rocket has delivered its payload to orbit. These large and often heavy pieces of space hardware can remain in orbit for years, posing significant collision hazards as part of the growing space debris problem. If left uncontrolled, rocket bodies have the potential to reenter Earth's atmosphere unpredictably, which can lead to falling debris in populated areas. Additionally, they risk colliding with operational satellites or the International Space Station, creating more debris and putting human life at risk.
Physical Characteristics

Length

1.1

Diameter

0.5

Span

1.1

Dry Mass

60

Launch Mass

120

Shape

Cyl

Radar Cross Section

0.9978

Visual Magnitude

Unknown

Color

Unknown

Material Composition

Unknown

Technical Details

Payload

SOZ

Purpose

Unknown

Mission

Unknown

Manufacturer

NPOE

Life Expectancy

Unknown

Bus

SOZ

Configuration

Unknown

Motor

Unknown

Equipment

Unknown

Power System

Unknown

ADCS

Unknown

Transmitter Frequency

Unknown

Satellite Articles

View All Posts »

Learn more about satellites and other related topics.

X Report 10 Jun 2025

X Report 10 Jun 2025

Exciting advancements from SpaceX include the debut of a new Dragon capsule for Axiom Space, continued Starlink deployments, and significant shifts in U.S. rural broadband funding that could benefit Starlink.

House Backs $55.5B Space Force Budget, Excludes $350B Reconciliation | KeepTrack Space Brief

House Backs $55.5B Space Force Budget, Excludes $350B Reconciliation | KeepTrack Space Brief

House appropriators approved $55.5 billion for Space Force but omitted $350 billion reconciliation funds, threatening Golden Dome and large-scale space programs' acquisition timelines.

Mike Melvill, 124 Meters, and the Morning Space Went Private

Mike Melvill, 124 Meters, and the Morning Space Went Private

On 21 June 2004, a 63-year-old test pilot rode a homebuilt rocket plane to 100,124 meters above the Mojave Desert, clearing the edge of space by about the length of a city block. He came down the first private astronaut in history, holding a sign that read 'SpaceShipOne, GovernmentZero.'

Vulcan GEM 63XL Passes Static Fire; February Anomaly Still Under Investigation | KeepTrack Space Brief

Vulcan GEM 63XL Passes Static Fire; February Anomaly Still Under Investigation | KeepTrack Space Brief

Northrop Grumman's GEM 63XL solid rocket booster passed static fire testing, but ULA's investigation into a February 2026 Vulcan in-flight anomaly remains open. No RTF date set.

X Report 14 Feb 2025

X Report 14 Feb 2025

Starship testing progresses at the Cape; Lynk Global secures funding amidst rising satellite competition.

Space Brief 29 Jan 2025

Space Brief 29 Jan 2025

Today's briefing covers the Space Force's plans for future launches, new initiatives in missile defense, and the latest on military and aerospace advancements.

X Report 12 Jul 2025

X Report 12 Jul 2025

SpaceX prepares for the Crew-11 astronaut mission launch, while Starlink continues to expand its satellite network in orbit.

X Report 28 May 2025

X Report 28 May 2025

Today marks significant milestones and setbacks for SpaceX as Starship Flight 9 completes a historic launch but ultimately suffers a loss of control. Additionally, a successful Starlink deployment continues to expand global internet coverage.