N-2 R/B(2) (16600)

COSPAR: 1986-016C | Alt Name: N-II-14F Stage 3
DECAYED

Image
N-2 R/B(2) Satellite Image
Additional Sources
Launch Details

Launch Date

February 12, 1986

Launch Site

TANSC

Launch Pad

N

Launch Vehicle

N-2

Orbital Elements

NORAD ID

16600

International Designator

1986-016C

Decay Date

11/2/2003

Basic Satellite Info

Name

N-2 R/B(2)

Alternative Name

N-II-14F Stage 3

Type

Rocket Body

Status

Space Junk

Owner

NASDA

Country

Japan

Constellation

N/A

Related Satellites

Major Events

N/A

Summary
A rocket body, also commonly referred to as an upper stage or spent rocket stage, is the structural shell left behind after a rocket has delivered its payload to orbit. These large and often heavy pieces of space hardware can remain in orbit for years, posing significant collision hazards as part of the growing space debris problem. If left uncontrolled, rocket bodies have the potential to reenter Earth's atmosphere unpredictably, which can lead to falling debris in populated areas. Additionally, they risk colliding with operational satellites or the International Space Station, creating more debris and putting human life at risk.
Physical Characteristics

Length

1.7

Diameter

0.9

Span

1.7

Dry Mass

83

Launch Mass

1123

Shape

Sphere + Cone

Radar Cross Section

2.0547

Visual Magnitude

Unknown

Color

Unknown

Material Composition

Unknown

Technical Details

Payload

Star 37E S/N 40104

Purpose

Unknown

Mission

Unknown

Manufacturer

THKE

Life Expectancy

Unknown

Bus

Star 37

Configuration

Unknown

Motor

Unknown

Equipment

Unknown

Power System

Unknown

ADCS

Unknown

Transmitter Frequency

Unknown

Satellite Articles

View All Posts »

Learn more about satellites and other related topics.

$4.16B Golden Dome Contract Awarded to SpaceX | KeepTrack X Report

$4.16B Golden Dome Contract Awarded to SpaceX | KeepTrack X Report

SpaceX wins a $4.16B Pentagon contract for missile-tracking satellites, while hitting its 50th Starlink launch of 2026 in a landmark May.

X Report 28 Dec 2024

X Report 28 Dec 2024

SpaceX wraps up a stellar year with Starship achievements and prepares for a lunar triple-shot in 2025.

Space Brief 5 Nov 2025

Space Brief 5 Nov 2025

Today's focus: Sidus Space's new AI edge computer, Space Force's dynamic operations initiative, and key Pentagon acquisition reforms.

X Report 3 Mar 2025

X Report 3 Mar 2025

SpaceX gears up for Starship Flight 8, with a launch set for Monday as final preparations are underway.

Crew-11 Astronauts Arrive in Houston After Historic ISS Evacuation | KeepTrack X Report

Crew-11 Astronauts Arrive in Houston After Historic ISS Evacuation | KeepTrack X Report

Crew-11 astronauts arrive in Houston following first-ever ISS medical evacuation. Starlink continues robust satellite deployment schedule with ongoing constellation expansion.

X Report 24 May 2025

X Report 24 May 2025

SpaceX experiences a setback with Starship Flight 8 while continuing its Starlink deployment efforts with a successful launch from California.

STARLINK-4621 Faces Critical Conjunction as Eight Satellites Reenter | KeepTrack X Report

STARLINK-4621 Faces Critical Conjunction as Eight Satellites Reenter | KeepTrack X Report

A HIGH-risk conjunction between STARLINK-4621 and the defunct SL-18 rocket body leads the July 11 safety picture, with eight Starlink satellites set to reenter through July 14.

Blue Origin's New Glenn Gantry Damaged; SpaceX Wins $4.16B Space Force Contract | KeepTrack Space Brief

Blue Origin's New Glenn Gantry Damaged; SpaceX Wins $4.16B Space Force Contract | KeepTrack Space Brief

Blue Origin's LC-36 gantry damaged in blast; CEO targets end-2026 return. SpaceX awarded $4.16B Space Force contract for airborne threat tracking satellites.