1996-036 Success

Space Shuttle Columbia / OV-102 | STS-78

Jun 20, 1996, 02:49 PM UTC

Track in KeepTrack

Launch Overview

Vehicle

Space Shuttle

Agency

Lockheed Martin Space Operations

Site / Pad

KSC / LC39B

Outcome

Success

Flight

STS-78

COSPAR Designator

1996-036

Mission

STS-78

STS-78 was the fifth dedicated Life and Microgravity Spacelab mission for the Space Shuttle program, flown partly in preparation for the International Space Station project. The mission used the Space Shuttle Columbia, which lifted off successfully from Kennedy Space Center’s launch pad 39-B on 20 June 1996.

Vehicle & Provider

Rocket

Space Shuttle

Provider

Lockheed Martin Space Operations

Agency launches

9 (5 YTD)

Site launches

95 (5 YTD)

Pad launches

38 (5 YTD)

Payloads (3)

Piece Name Owner State Track
1996-036 Spacelab Long Module 2 MSFC US
1996-036 EDO JSC US
1996-036A OV-102 JSC US Track